This blog is the daily diary of the construction of our 2000 square foot home in Cape Elizabeth Maine.
Wednesday, July 11, 2012
Tile work nearly completed. Tomorrow, driveway prepartion and landscaping.
Donnie was back today adding the glass accent tiles to the master bath shower. Grout was added to the small bath and washer/dryer closet. Marble was added to several flat areas including the shower threshold. Finally the splash guard for the tub was completed and the toilet in the master bath was set.
The air exchange control unit was installed.
The mailbox post was installed with much effort. The guys had to go through many rocks to get to the right depth.
What a treat that our good friend Tom was able to stop by and relax on our porch swing.