In just 2 days the appliances were delivered, countertops installed, interior trim completed, window film removed and door hardware installed.
Before and... |
after. |
The double oven arrived (greatly needed for Thanksgiving). |
The dishwasher, left and |
The fridge is already in place. |
The windows finally look clear with the lables removed. |
The kitchen countertop is installed along with the double-sided sink. |
We love the windows, but I'll need to wear shades and more clothes as I walk through the living area. |
The rear bedroom before... |
and after. |
The master bedroom before... |
and after. |
Rooney loves the new carpet. |
Let the light IN! |
The black door hardware with the square bezels is dramatic and matches the cottage style doors. |
The oversized mailbox post goes in tomorrow too. |
Tomorrow we say goodbye to our dumpster in prepartion for the driveway and landscaping to be started on Thursday. I'm certainthe neighbors will say "good riddance." |