A lot can happen in just 2 days...

In just 2 days the appliances were delivered, countertops installed, interior trim completed, window film removed and door hardware installed.


Before and...

after.
The double oven arrived (greatly needed for Thanksgiving).

The dishwasher, left and

The fridge is already in place.

The windows finally look clear with the lables removed.

The kitchen countertop is installed along
with the double-sided sink.



We love the windows, but I'll need to wear shades and
more clothes as I walk through the living area.




The rear bedroom before...
and after.
The master bedroom before...
and after.

Rooney loves the new carpet.
Let the light IN!






The black door hardware with the square bezels
is dramatic and matches the cottage style doors.

The oversized mailbox post goes in tomorrow too.
Tomorrow we say goodbye to our dumpster in prepartion for the driveway and landscaping to be started on Thursday.  I'm certainthe neighbors will say "good riddance."