In just 2 days the appliances were delivered, countertops installed, interior trim completed, window film removed and door hardware installed.
| Before and... |
| after. |
| The double oven arrived (greatly needed for Thanksgiving). |
| The dishwasher, left and |
| The fridge is already in place. |
| The windows finally look clear with the lables removed. |
| The kitchen countertop is installed along with the double-sided sink. |
| We love the windows, but I'll need to wear shades and more clothes as I walk through the living area. |
| The rear bedroom before... |
| and after. |
| The master bedroom before... |
| and after. |
| Rooney loves the new carpet. |
| Let the light IN! |
| The black door hardware with the square bezels is dramatic and matches the cottage style doors. |
| The oversized mailbox post goes in tomorrow too. |
| Tomorrow we say goodbye to our dumpster in prepartion for the driveway and landscaping to be started on Thursday. I'm certainthe neighbors will say "good riddance." |
No comments:
Post a Comment