| The Leeboy 1000-F arrives and is ready for work. |
| The lawn was seeded and covered with straw just minutes before the Leeboy along with the crew arrived. |
| The foundation is completely installed. Sometime in October the topcoat goes down. In Maine, the asphalt companies close just before Thanksgiving. |
| Right before a storm, the lighting is very dramatic. |
| The bedrooms were cleaned today, the screens installed and the master bed set up. Tomorrow, our builder goes for our Certificate of Occupancy. |
No comments:
Post a Comment