The spray foam has been completed throughout the house and the batting is ready to be installed on top. |
The tub/shower inclosure in the guest bath is placed. |
The soaking tub has arrived and is ready for placement in the MB. |
The wainscoating under the front porch is being half-way to being installed. The main feature under the porch will be Donna's front porch swing. |
No comments:
Post a Comment