Donnie began laying the oversized tile for the entryway, closet and pantry today. Note the angle to accentuate the tile and hardwood difference. |
Tile in the guest bathroom was begun today as well. |
This is Donna's side of the walk-in master bedroom closet with newly installed poles. |
The end cabinet was incorrectly sized and had to be replaced. Tomorrow Blue Rock Inc. comes in to measure and template the granite counter-tops. |
As stroke of luck for us! The original end cabinet mentioned above fits perfectly in our hall and makes a nice transition from dining/living space to sleeping space. Granite top to follow. |
The mirror frame was added today. |
as well as the black hardware for the drawers and doors of the vanity. |
No comments:
Post a Comment