Tuesday, January 24, 2012

Backfilled, Sanded and Compacted.


Many truck loads of fill are brought in, then covered with gravel,
then sand and compacted.
The pouring of the slab is several weeks away.




This is from the lower level.  Walls will be built on the foundation seen in the foreground.  It's much less expensive than pouring concrete all the way up to the 1st floor level.


Craig now has his sign up.  Lumber delivery can't
be too far behind.